Loading...
Checkoff Sheet MS-2015-00349.tif P• 2009 INTERNATIONAL RESIDENTIAL CODE' CITY OF BLAIR REROOFING CHECKOFF SHEET Return to BIair City Hall prior to Final Inspection 2'18 S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements fallowing this reroofing jab. Property Address. ��t� 'KU�r� Contractor or homeowner (if self) : Permit #: MS-20 Installation date: YES O The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R9U7.1) ICE PROTECTION INSTALLED An ice barrier that censlsts of at least two layers of underlayrrnent or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.27.1) STRUGTURAL COMPONENTS ARE St}UND: The structural roof components are ' capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907.2) ® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one cf the reasons required by section 8907.3 r DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter flashing were not reinstalled if rusted. (8907.5) FLASHING INSTALLED PROPERLY. Flashing shall be reconstructed in accordance With approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation.-(R9 ©7.6) Si a r of Primary nstailer Date Signature of Permit Holder Date y I