Checkoff Sheet MS-2015-00277.tif i
I
Aug, 10. 2015 3 24P No. 6845 P. 1
2009 INTERNATIONAL RESIDENTIAL CUUI='
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair City Hall prior to Final inspection
218 S ie street, s lair, NE 6500$
I
Because of limitations caused by the infeasibility to perform detailed inspections which would
i
not interfere with reroofing work, please indicate compliance with the following requirements
following 'this reroofing job. ,
pro ertq Address: by
Contractor or Homeowner (If self)
Permit9* WIS ^20 bO
Installation Date*
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
�i ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eava's ed a to a point at Is 24 inches inside the exterior
wall line of the building. (R905.2,7,1)
9 uCTURAL COMPONENTS ARB SOI The structural roof components are
capable of supporrtlhg the roof covering systsM and the material and equipment loads
that will be encountered during Installation of the roof covering system. (8907.2)
�l EXISTj COV WAS REMOVED: P)dsting roof covering was removed for one
of the reasons required by section 8907.3
QID NOT USE RUSTOP METAL, 0Z FLASHING: EAsting vent flashing, metal edges,
drain outlets, Dollars or metal counter-flashing were not reinstalled if- rusted. (8907.5)
FLASHING IN PRQPERt'Y: Flashing shall be reconstructed in $coordance
with appioved'manufacturer's installation instructions. Metal flashing to which
bitumina s materials are to be adhered shall be primed prior to Installation,- (11907.6)
Signaturs of Pri ns to
Signature of Permit Holder Dke