Loading...
Checkoff Sheet MS-2015-00277.tif i I Aug, 10. 2015 3 24P No. 6845 P. 1 2009 INTERNATIONAL RESIDENTIAL CUUI=' CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final inspection 218 S ie street, s lair, NE 6500$ I Because of limitations caused by the infeasibility to perform detailed inspections which would i not interfere with reroofing work, please indicate compliance with the following requirements following 'this reroofing job. , pro ertq Address: by Contractor or Homeowner (If self) Permit9* WIS ^20 bO Installation Date* YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) �i ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eava's ed a to a point at Is 24 inches inside the exterior wall line of the building. (R905.2,7,1) 9 uCTURAL COMPONENTS ARB SOI The structural roof components are capable of supporrtlhg the roof covering systsM and the material and equipment loads that will be encountered during Installation of the roof covering system. (8907.2) �l EXISTj COV WAS REMOVED: P)dsting roof covering was removed for one of the reasons required by section 8907.3 QID NOT USE RUSTOP METAL, 0Z FLASHING: EAsting vent flashing, metal edges, drain outlets, Dollars or metal counter-flashing were not reinstalled if- rusted. (8907.5) FLASHING IN PRQPERt'Y: Flashing shall be reconstructed in $coordance with appioved'manufacturer's installation instructions. Metal flashing to which bitumina s materials are to be adhered shall be primed prior to Installation,- (11907.6) Signaturs of Pri ns to Signature of Permit Holder Dke