Checkoff Sheet MS-2014-02214.tif 2009 INTERNATIONAL RESIDENTIAL CODE
C ITY OF , BL AIR E FIN T
Return to Blair City Hall prior to Final Inspection
218 S 16 Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
°
Property Address
Contractor or Homeowner (if self) : Z -a
Permit
Installation Date: 12 L-C) t0l/1 ✓�
Y S NO
❑ The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self- adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
❑ STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907,2)
❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of a reasons required by section R907.3
❑ DID NOT USE RUSTI =D METAL OR FLASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
❑ FLASHING INSTALLED PROPERLY; Flashing shall be reconstructed in'accordance
with approved manufacturers installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
� �
al Signature of Primary Installer Date
Signature of Permit Holder Date