02506_0001.tif Aug 06 2015 9:10AM HP FaxRemodeling Dreams 712 - 256 -7660 page 4 WENTIAL CODE
r '�+ ' .
!i
R eturn to lair �n y.Hall prior to' F inal nspectian
2'18 "16 Street, Blair, NE 88008
Because of [imitations caused by the infeasibility to
; :perform- , detailed Inspections which would
not interfere with reroofing work, please indicate com liance with the followi r
p g q ents �
following this reroofing job.
Property Address:t:
Contractor or Homeowner (if self)
Pe rmit S -2
M 0'!
4- 6. 60
Installation Date: I
I
YES NO f
❑� Q The materials and methods of application used for recovering or replacing -the existing j
roof covering.complywith the . the building code. (R 07A)
❑ ICE PROTECTION INSTALLE An ice barrierthat consists of at least two layers of
underlaymenfi or f a self= adherin'g� polymer modified bitumen sheet Was installed and
extends at -least from the eave's 'edae to a point a t least 24. inches .inside the exterior
wall line of the building.: (R905.27.1)
STRUCTURAL COMPONItNTS, ARE SOUND: The,stt6ctural roof components are
capable of su0port�r g the 6 , r6 of covering system and the and equipment loads
that will be erlcourttered during ins #allation of the roof covering system. (R907,2)
EXISTING gPVERING VV
AS REMOVED;, ;Existing °roof cpverlr<g.was removed for one
of the reasons required -by section- R907.3 .
DID NOT USE RUSTED MtTAL OR FLASHING.* aisting vent flashing, metal edges,
drain outlets., collars or,met6l counter- flashing we're not reinstalled if rusted. (11807.5)
FLASHING INSTALLED PkOPEF LY; Flashing shah be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
Signature qf r i taller Date
Sin of P if der Date
i
I