Loading...
02504_0001.tif i i Aug 06 2015 9 :09AM HP FaxRemodeling Dreams 712 -256 -7660 page 2 2V u )0% INTERP1141ATIO.NAL RRESIDE,"TIAL CODE R eturn to Blair Cty'Hll prior to' final Inspection 218 S 16 Street, Blair, NE 68008 j Because of limitations caused: by.thOnfeasi;bility to perform deta,iled,iinspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Property. Address: l ' Contractor or Homeowner (if self) Permit M. MS-2014-.6 Installation Date.s� YES NO The materials and, methods of application used for recovering or replacing the existing roof covering.comply with the requirements of the building code. (13907.1) i 0 ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the bddlhg. (R905.2.7.1) STR UCTU RAL COMPONENTS ARE SO UND-„ The structural roof components are capable of supper r g, the rap .. covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907,2) EXISTING. COVERING WAS. REMOVE©: Existing- roof covering was removed for one of the reasons required by section.: R907.3 DID NOT USE RU TEED M&LTAL OR FLASHING Existing vent filashing, metal edges, drain outlets,'oo metal flashing were not reinstalled if rusted, (R907.5) FLASHING..tNSTALLED PP.C7PERLY. Flashing shall be reca0structed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Sign of rim Miler Date 12- #u f rmit Ider Tate i