Loading...
00222_0001.tif i Aug 05 15 08:49a Allison Blaich 402 - 933 -2995 p.1 CITY OF BLAIR REROOF' CHECKOFF' SHEET Return to Blair City Mall prior to. Final Inspection 218 S 16 Street, Blair, NE 60005 Because of limitations caused by the infeasibility to perform detailed lnspectipns which would not interfere with reroofing worst, please indicate compliance with the following requirements fallowing this- reroofing job. Property Address. ` S Contractor or Homeowner (if self) : c� G , yc ip L I- Permit #: MS-201F � Installation Date, -- YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements 'of the building code. (R907.1) ICE PROTECTION INSTALLED. An ice harrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall fine of the building. (8906,2.7.1) L� STRUCTURAL, Ct7Ml?ONiNTS .48E SOUND. The structural'rooi components are , capable of supporting the roof covering, system and the material and equipment loads that. will be encountered during installation of the roof covering' system. '(*907.2) EXISTING COVERING WAS REMOVED. Existing roof covering was removed for one of the reasons required by section R907.3 DID�NOT USE RUSTED METAL OR PLASHING Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) I FLASHING INSTAL LED PROPERLY; Flashing shall be reconstructed in accordance with approved manufacturer's Installation instructions. Metal flashing to which bituminous materfals are to be adhered shall be primed prior to installation. (RG07.6) Slgnatur f Primary Installer Orate i Signature of Permft Holder Date