CITY OF BLAIR REROOF' CHECKOFF' SHEET
Return to Blair City Mall prior to. Final Inspection
218 S 16 Street, Blair, NE 60005
Because of limitations caused by the infeasibility to perform detailed lnspectipns which would
not interfere with reroofing worst, please indicate compliance with the following requirements
fallowing this- reroofing job.
Property Address. ` S
Contractor or Homeowner (if self) : c� G , yc ip L I-
Permit #: MS-201F �
Installation Date, --
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements 'of the building code. (R907.1)
ICE PROTECTION INSTALLED. An ice harrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall fine of the building. (8906,2.7.1)
L� STRUCTURAL, Ct7Ml?ONiNTS .48E SOUND. The structural'rooi components are ,
capable of supporting the roof covering, system and the material and equipment loads
that. will be encountered during installation of the roof covering' system. '(*907.2)
EXISTING COVERING WAS REMOVED. Existing roof covering was removed for one
of the reasons required by section R907.3
DID�NOT USE RUSTED METAL OR PLASHING Existing vent flashing, metal edges,
drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
I
FLASHING INSTAL LED PROPERLY; Flashing shall be reconstructed in accordance
with approved manufacturer's Installation instructions. Metal flashing to which
bituminous materfals are to be adhered shall be primed prior to installation. (RG07.6)
Slgnatur f Primary Installer Orate
i
Signature of Permft Holder Date