20150806095119573_0001.tif Aug 05 15 08;49a Allison Blaich 402 - 933 -2995 p.2
i
i
I
CODE
C ITY T
Return to Blair City Hall prior to Final Inspection j
218 S 16" Street, Blair, NE 68008 1
Because of limitations caused by the infeasibility to perform detailed inspections which would
not Interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Property Address
Contractor or Homeowner (if sell) : ��[ U- + C) o �c L LJ
Permiit#: MS -20
r !
�I� Installation Date- ck'k— qd11)1 CS C P q.._-
YES No 1� °
The materials and methods of application used for recovering or replacing the existing
roof covering comply v0th the requirements of the building code. (R907.1)
ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underiayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
Q STRUCTURAL. COMPONENTS ARE SOUND• The structural roof components are
capable of supporting the roof coverhrng system and the material and equipment loads
that will be encountered during installation of the roof covering system. (11907.2)
EXISTING COVERING WA, REMOVED; Existing roof covering was removed for one
of the reasons required by section R907.3 j
Q C3 DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter flashing were not reinstalled if rusted. (R907.5)
® FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
f
Signature o Primary a her D e
Signatdirb of 1 Helder Date
17 ��