1201_0001.tif i
!
2009 INTERNATIONAL RESIDENTIAL CODE -
CITY OF B LAI R REROOFING CHECKOFF SHEET
Return to Blair City Hall' prior for to Final inspection
210 S l 61h street. Blair, NE 65008
Because of limitations caused by the infeasibility to•perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Permit #:
instaliatin Date:
YE NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
(� ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was rnstalied and
extends at least from the eave's edge to a point at leash 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
STRUCTURAL COMPONENTS ARE soUN The structural roof components are
material and equipment loads
capable of supporting the roof covering syst em and the
that will be encountered during installation of the roof covering system. (R907.2)
EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section 8907.3
i
C]
NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter- flashing were not reinstalled if rusted. (R907.6)
FLASHING INSTALLED PROPERLY; Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
_l
' Date
Signature of rimary Installer
re
Date
Sign/ure of Permit Holder