1922_0001.tif 2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF BLAIR SH
Return to Blair City Hall prior to Final Inspection
218 S 16" Street, Blair NB 68008
Because of limitations caused by the infeasibility to'perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Perm►tl c
Installation Date:
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
i
ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edgd to a point at least 24 inches inside the exterior
wall line of the building. (R905.2,7.1)
STRUCTURAL COMPONENTS ARE SOUND: The structura erial and equipment loads
capable of supporting the roof covering system and th
that will be encountered during installation of the roof covering system. (R907.2)
® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
i
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufactu ' installation instructions. Metal flashing to which
i inous materi re to b dhered shall be primed prior to installation. (R907.6)
cs P [
Sign ure of Pr' ry
st r Date
Sig ture of Permit Holder
�` Date