Loading...
1922_0001.tif 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF BLAIR SH Return to Blair City Hall prior to Final Inspection 218 S 16" Street, Blair NB 68008 Because of limitations caused by the infeasibility to'perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Perm►tl c Installation Date: YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) i ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edgd to a point at least 24 inches inside the exterior wall line of the building. (R905.2,7.1) STRUCTURAL COMPONENTS ARE SOUND: The structura erial and equipment loads capable of supporting the roof covering system and th that will be encountered during installation of the roof covering system. (R907.2) ® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) i FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufactu ' installation instructions. Metal flashing to which i inous materi re to b dhered shall be primed prior to installation. (R907.6) cs P [ Sign ure of Pr' ry st r Date Sig ture of Permit Holder �` Date