Loading...
1202_0001.tif INTERNAT QTY OF BLAIR REROOFING Return to Blair City Hall prior to Final Inspection 218 S '16 Street,. Blair, NE 68008 Because of limitations caused by the infeasibility to detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements fotlowin this reroofing job. Permit #: r t ��' , Installation Date: _} YES NO ( The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) I (� ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers 'of underiayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eaye's edge to a point at lea 24 inches inside the exterior wall line of the building. (R905.2.7.1) Q STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) E AS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 i • 1 I NO RUSTED METAL OR PLASHING% Existing vent flashing, metal edges, drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (R907.5) FLASHING INSTALLED PROPERLY: Plashing shall be reconstructed in accordance with approved rer's installation instructions. Metal flashing to which itu 'no aterials are o be adhered shall be primed prior to installation. (R907.6) Signature ri a Iler H Date S' nature of Pe mit Hot er i i