1202_0001.tif INTERNAT
QTY OF BLAIR REROOFING
Return to Blair City Hall prior to Final Inspection
218 S '16 Street,. Blair, NE 68008
Because of limitations caused by the infeasibility to detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
fotlowin this reroofing job.
Permit #:
r t ��' ,
Installation Date: _}
YES NO
( The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
I
(� ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers 'of
underiayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eaye's edge to a point at lea 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
Q STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
E AS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
i
• 1 I
NO RUSTED METAL OR PLASHING% Existing vent flashing, metal edges, drain
outlets, collars or metal counter- flashing were not reinstalled if rusted. (R907.5)
FLASHING INSTALLED PROPERLY: Plashing shall be reconstructed in accordance
with approved rer's installation instructions. Metal flashing to which
itu 'no aterials are o be adhered shall be primed prior to installation. (R907.6)
Signature ri a Iler
H
Date
S' nature of Pe mit Hot er
i
i