01200_0001.tif 2009 INTERNATIONAL RESID
QTY L 1
Return to Blair Cit Hall pr`lor to Final Inspection
218 s '16 Street Blai NE 68008
Because of limitations caused by the infeasibility to'perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Permit #: y
Installation Date: e "
i
YES NO
Ef The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
ICE PROTECTION CN5TALLED: An ice barrier that consists of at least two layers of
modified bitumen sheet was
installed and
underlayment or of a self- adhering polymer
extends at least from the eaye's edge inside the exterior
to a point at least 24 inches
wall line of the building. (R905.2.7.1)
STRUCTURAL. COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
I� E AS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
Q NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
G 1- d 0Y I
Signature rimary Install-
Date
,
Date
Sign ture of Permit Holder
i
i