Loading...
01200_0001.tif 2009 INTERNATIONAL RESID QTY L 1 Return to Blair Cit Hall pr`lor to Final Inspection 218 s '16 Street Blai NE 68008 Because of limitations caused by the infeasibility to'perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Permit #: y Installation Date: e " i YES NO Ef The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ICE PROTECTION CN5TALLED: An ice barrier that consists of at least two layers of modified bitumen sheet was installed and underlayment or of a self- adhering polymer extends at least from the eaye's edge inside the exterior to a point at least 24 inches wall line of the building. (R905.2.7.1) STRUCTURAL. COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) I� E AS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 Q NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) G 1- d 0Y I Signature rimary Install- Date , Date Sign ture of Permit Holder i i