00213_0001 (2).tif 2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF BLAIR REROOFING CHECKOFF SHEET
Retu it t 1 p rior 1 Inspection
` Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance e with the following re uiternent
kAgMft this reroofing job.
ropert Address:
Contractor or Homeowner ff.seM: $ a.
Permit g..
installation bate,
YES NO
The materials.and methods of application used for recovering or replacing the existing
roof `covering comply witli the requirements of the building code. (R907.1)
ICE PROT UTI i INSI LLR . An lee barrier that consists of at least two layers of
underlayment or of a self adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches Inside the exterior
1 A 1 wall line ,ofthe building. (Rg05.2.7.1)
STPUC TUML C LTS ARE SOUND. The structural roof components are
capable of sul5port1bg the roof covering system and the material and equipment leads
that will be encountered during installation, of the roof covering system, {R7.}
l Ti G COVERINGWAS REMOVED. Existing roof ,covering was removed for one
of the reasons req ire 'by section 119073
4
PID NOT USE RUSTEDAETAL OR FLASHING. Existing vent flashing, metal edges,
drain outlets, collars car metal counter-flash Ing were not reinstalled If rusted. (R907.5)
i
FLASHING I TALL ' P. IS E. `. plashing shall be reconstructed in accordance
Frith approved manufaef urerla installation instructions, Metal flashing to which
bit uminous matedals aro:to be adhered Shall be primed priorto installation, -(R 7®
i
Signature o fimary l s all r bate
-7/
Sign Of Permit Holder Date
.. i
i