Loading...
00203_0001 (2).tif 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF B LAIR REROOFING CHECKOFF SHEET Retu f it City Hall p rio r to Final Inspection 218 8 " Street, Blair, NE 68008 Because of limitations caused by the Infeasibility t perform detailed inspections which would rt t interfere with reroofing work, please indicate compliance with the following requirements fo� this reroofing job. Property Address: V—S Co ntractor or lorneorner (if Sam : r Installation Cate. c YES No The materials and methods of application used for recovering or re placing the existing roof covering comply with the requirements of the buifdtn code, { 9 7.x} ICE 9R0TEGTI N ll §1 LL D : An ice barrier that consists of at least two layers of Allt, underlayrnent or of a s6 If-adhering polymer moduied bitumen sheet was installed lled and extends at least from the eave's edge to a point gt least 24 inches inside the exterior exterior (Ii wall lute of the building: (R905.2.7, 1) STRUCTUML COWONENTS ARE SOUND: The structural roof components are i capable of supporting th6 roof covering system and the material and equipment loads that will be encountered during installation of the roof: covering system. (8907,2) i i E COVERING LIAR RMl# Existing roof covering was removed for one of the reasons required by section R907. DID NOT U P RUSTED L R FLASHING Existing vent flashing, metal ;edg drain outlets, ollarrs or'rrttl counter- fialtlnre not reinstalled If rue. (9017.) r i FLASHING I T,ALLED PROPERLY: PERLY: Flashing shall e moon tructe it t accordance, approved r�anuafurer's instaliet[on instructions, Metal flashing to Which i bituminous materials are to be adhered shall be primed prior to Installation. (8907,6) Sig nat u re Rrlrnry�s at[r Date Sid at of Permit Holder l a i f _........__ ................ _.. � .... . .... ........_._....._.._._....