00203_0001 (2).tif 2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF B LAIR REROOFING CHECKOFF SHEET
Retu f it City Hall p rio r to Final Inspection
218 8 " Street, Blair, NE 68008
Because of limitations caused by the Infeasibility t perform detailed inspections which would
rt t interfere with reroofing work, please indicate compliance with the following requirements
fo� this reroofing job.
Property Address: V—S
Co ntractor or lorneorner (if Sam : r
Installation Cate. c
YES No
The materials and methods of application used for recovering or re placing the existing
roof covering comply with the requirements of the buifdtn code, { 9 7.x}
ICE 9R0TEGTI N ll §1 LL D : An ice barrier that consists of at least two layers of
Allt, underlayrnent or of a s6 If-adhering polymer moduied bitumen sheet was installed lled and
extends at least from the eave's edge to a point gt least 24 inches inside the exterior
exterior
(Ii wall lute of the building: (R905.2.7, 1)
STRUCTUML COWONENTS ARE SOUND: The structural roof components are i
capable of supporting th6 roof covering system and the material and equipment loads
that will be encountered during installation of the roof: covering system. (8907,2)
i
i
E COVERING LIAR RMl# Existing roof covering was removed for one
of the reasons required by section R907.
DID NOT U P RUSTED L R FLASHING Existing vent flashing, metal ;edg
drain outlets, ollarrs or'rrttl counter- fialtlnre not reinstalled If rue. (9017.) r
i
FLASHING I T,ALLED PROPERLY: PERLY: Flashing shall e moon tructe it t accordance, approved r�anuafurer's instaliet[on instructions, Metal flashing to Which i
bituminous materials are to be adhered shall be primed prior to Installation. (8907,6)
Sig nat u re Rrlrnry�s at[r Date
Sid at of Permit Holder l a
i
f
_........__ ................ _.. � .... . .... ........_._....._.._._....