07/23/2015 10:21 4025720154 UNITED SERVICES PAGE 01/01
2009 IN'TERNATIONAL RESIDENTIAL COME
CITY OF BLAIR REROOFING
Return to lair City Hall prior to Final inspection
218 s Je Street, Blair, NE 65008
Eecause of limitations caused by the Infeasibility to perform detailed inspections which would
riot Interfere with reroofing worn, please indicate compliance with the following requirements
followin -g this reroofing job.
Property Address:
Contractor or Homeowner (if self) " o ijfd
Permit ffi.
I
installation Cate: - !` `
1
I
YES NO
I
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (8907.1)
( 10E PROTECTION INSTALLED : An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen shut was installed, and
extends at least from the eaye's edge_ to a point at least 24 inches inside the exterior
wall line of the building. (8905.2,7.1)
sTPUCTURAL COMPONENTS ARE SQUft The structural roof components are
capable of suppordhg the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (11907,2)
EXISTING COVERING WAS REMOVED Existing roof covering was removed for one
of the reasons required by section 1907.3
DID NOT USE RUSTtD METAL OR FLASHING: existing vent flashing, metal edges,
drain outlets, Dollars or metal counter - flashing were not reinstalled If rusted. (8907.5)
PLASHING INSTALLED PROPERM 1;Iashing shall be reconstructed in accordance
whit approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to Installation. (R907.5)