00321_0001 (2).tif 200 9 if ff E � R I A]' N, A R I D 1 1y' IT I A L C
7
CITY OF BLAIRX Rf"RZODFING CIA CKOFF SHEET
Return to Blair City Hall prior to Final inspection
218 8 16 Street, Blair, NE 68008
Because of limitations caused by the Infeasibility to perform detailed Inspections which would
E!oi interfere with reroofing work, please Indicate compliance with the following requirements
following this reroofing job.
Permit M
Installation Date:
YY NO
The materials and methods of application used for recovering or Teplacing the existing
roof coveting comply with the requirements of the building code, (R907,
ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitUMen sheet was installed and
extends at least from the e a ve's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7,i)
STRUCTURAL COMPONENTS ARE SOUND: The structural roof componenIS are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during Installation of the roof covering system, (8907.2)
EXISTING COVERING WAS FIZEMOVED; Existing roof covering was removed for one
of the reasons required by section 8907,3
Ll NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or meta) counter - flashing were not reinstalled if rusted, (8907,5)
/
V ,
M D FLASHING INSTALLED PROPERL Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation, (8907.6)
e
2
D
v6 rista let
��