Loading...
00294_0001 (2).tif I 07/21/2015 09:19 4027333990 THO PAGE 01 RES 200 INTERNATIONAL CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair vital Hall prior to Find InapL tlon 21 a s i e Street, Blair, NE 68008 Because of limitations cAused by the Infeasibility to perform detailed fnspec Inspections pair menu to Interfere with reroofing work, plOase Indleats compliance with foli gAing this reroofing job. -Z prope�rtY Address: " X ,•� Contractor or Homeowner (if self) Permit 9: MS-2 V , ec'P tnstatlattorru; ,,�;. ' +r' - YES NO f� The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907. (� ME PROTECTION INSTALLED: An ice barrier that consis fat lea as� s Ye and underlayment or of a self- adhering polymer modified extends at [east from the cave's edge to a point at least 24 in has inside the exterior wall line of the building. (R905.41. - 0 STET L coMPONENTS ARE gOHND " `the structural roof components are capable of suppodhg the roof covering system and the material and equipment loads that will be encountered during Installation of the roof covering system. (11907,2) i P3CIsTINc Ct VER N Alm S REMDVED: Usting roof coveting was removed for one of the reasons required by section Rl.0 7.� DID._N�T 5E I ta;3Y D t�IEYAL OR F 5 INC: fisting vent flashing, metal edges, drain outlets, Coliars or metal counter - flashing were not reinstalled If rusted. (8907.5) FLASHING INSTALLED pROFt!�lrY: dashing shall be reconstructed In accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to Installaflon.-(11907.6) Sfgnat re of Primary Installer pate Signature of Permit Holder � Date I �I