RES 200 INTERNATIONAL
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair vital Hall prior to Find InapL tlon
21 a s i e Street, Blair, NE 68008
Because of limitations cAused by the Infeasibility to perform detailed fnspec Inspections
pair menu
to Interfere with reroofing work, plOase Indleats compliance with foli gAing this reroofing job.
-Z
prope�rtY Address: " X ,•�
Contractor or Homeowner (if self)
Permit 9: MS-2 V , ec'P
tnstatlattorru; ,,�;. ' +r' -
YES NO
f� The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.
(� ME PROTECTION INSTALLED: An ice barrier that consis fat lea as� s Ye and
underlayment or of a self- adhering polymer modified
extends at [east from the cave's edge to a point at least 24 in has inside the exterior
wall line of the building. (R905.41. - 0
STET L coMPONENTS ARE gOHND " `the structural roof components are
capable of suppodhg the roof covering system and the material and equipment loads
that will be encountered during Installation of the roof covering system. (11907,2)
i
P3CIsTINc Ct VER N Alm S REMDVED: Usting roof coveting was removed for one
of the reasons required by section Rl.0 7.�
DID._N�T 5E I ta;3Y D t�IEYAL OR F 5 INC: fisting vent flashing, metal edges,
drain outlets, Coliars or metal counter - flashing were not reinstalled If rusted. (8907.5)
FLASHING INSTALLED pROFt!�lrY: dashing shall be reconstructed In accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to Installaflon.-(11907.6)
Sfgnat re of Primary Installer pate