Checkoff Sheet 00247_0001.tif 07/17/015 FRI 11:34 FAX U001 /001
N L RESIDENTIAL CODE'
1Y OF BLAIR I H T
Return to Nair C y Hatt prior to Final inspection
21 S 16 Street, Blair, NB 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Property Address: r
Contractor or Homeowner (if self) : a l
Permit 9: MS�20 l • - r
Installation Date:
YES NO
I ❑ The materials and methods of application used for recovering or replacing the existing
roof covering comply with, the requirements of the building code. (R907.1)
❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self- adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches ins €de the exterior
wall line of the building. (R905.2.7.1)
I+� STRUCTURAL C OMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment Loads
that will be encountered during Installation of the roof covering system. (R907.2)
❑ EXISTING COVERING WAS REMOVED; Existing roof covering was removed for one
of the reasons required by section R907.3
DiD NOT USE RUST> =D METAL OR FLASHING: Existing vent flashing, metal edges,
drain outlets, Qollars or metal counter - flashing were not reinstalled if rusted. (R907.5)
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
Signature of Primary Ins ler Date
Z22n/ 5
Date
Signa Permit Holder
ture of
i