Loading...
00295_0001.tif i i 07/16/2015 09:56 4027333990 THD PAGE 01 2009 INTERNATIONAL RESIDENTI AL C O"D E' CITY OF BLAIR REROOFING CHECKOFF SHEET Return to wair city H all prior to Final Inapeetion 218 S le Street, B lair, NE 88008 Racause of limitations caused by the Infeaslbllity to p$rform detailed Irlepections which would i Interfere with reroofing work, please Indicate compliance with the following requirements owin this reroofing Job. j Properfy Address• C Contractor or Homeowner (if self)' Permit . installation Dato: YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907-1) ICE PRGTI cT QN INSTALLED: An ice barrier that consists of at lust two layers of undedayment or of a self - adhering polymer moditled bitumen sheet was installed and extends at least from the eave's edge_ to a polnt at least Winches inside the exterior wall line of the building. (R905.2,7.1) LJ Q RUCTURAL COMPQNENTS AR Sr a: The structural roof components are capable of supportlhg the roof oovl�ring system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907,2) STING COVERING WAS REMOvECI: Existing roof covering was removed for one j of the reasons required by section R907.3 Dip- NOT jsE R PLASHING_ Existing vent flashing, metal edges, grain outlets, ciollars or metal counter - flashing were not reinstalied if rusted. (R907.5) FWHING INS T L,E12 PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are t0 be adhered shall be primed prior to Installation. (R907,6) Signature f Primary installer ate Signa ure o Permit li r� 'Date I I