00295_0001.tif i
i
07/16/2015 09:56 4027333990 THD PAGE 01
2009 INTERNATIONAL RESIDENTI AL C O"D E'
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to wair city H all prior to Final Inapeetion
218 S le Street, B lair, NE 88008
Racause of limitations caused by the Infeaslbllity to p$rform detailed Irlepections which would
i Interfere with reroofing work, please Indicate compliance with the following requirements
owin this reroofing Job. j
Properfy Address• C
Contractor or Homeowner (if self)'
Permit .
installation Dato:
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907-1)
ICE PRGTI cT QN INSTALLED: An ice barrier that consists of at lust two layers of
undedayment or of a self - adhering polymer moditled bitumen sheet was installed and
extends at least from the eave's edge_ to a polnt at least Winches inside the exterior
wall line of the building. (R905.2,7.1)
LJ Q RUCTURAL COMPQNENTS AR Sr a: The structural roof components are
capable of supportlhg the roof oovl�ring system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907,2)
STING COVERING WAS REMOvECI: Existing roof covering was removed for one j
of the reasons required by section R907.3
Dip- NOT jsE R PLASHING_ Existing vent flashing, metal edges,
grain outlets, ciollars or metal counter - flashing were not reinstalied if rusted. (R907.5)
FWHING INS T L,E12 PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are t0 be adhered shall be primed prior to Installation. (R907,6)
Signature f Primary installer ate
Signa ure
o Permit li r� 'Date
I
I