Loading...
00325_0001.tif 2009 INTERNATIONAL Rr- CODE CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection 218 8 16 Street, Blair, NE 68008 Because Of limitations caused by the infeasibility to perform detailed Inspections which would 101 interfere with reroofing work, please indicate compliance with the following requirements following this reroofing)ob. Permit M Installation Date. Y;r N 0 The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code, (R907,1) ICE PRQTECTION INSTALLED, An ice barrier that consists of at least two layers of underlaymeni or of a self-adhering Polymer modified bitumen sheet was installe and extends at least from the eave's edge to a point at least 24 inches inside the e)derior di t"I I wall line of the building. (R905.2.7. 1) STRUCTURAL Ct7f P 7P BP TS ARE SOUND, The structural roof components are capable Of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) REMOVED. Existing Toof covering was removed for one of the reasons required by section 8907,3 NO RUSTED LOETAL OR FLASHING, Existing vent flashing, metal edges, drain outlets, collars or meta) counter-flashing were not reinstalled it rusted, (8907.5) FLAS MG INSTALLED PaRQ_PFRLY- Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907.6) Inlllf Dale fix: