Loading...
00438_0001 (2).tif J u 1. 16. 2015 2:12PM No, 3230 P. 2 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF BLAIR REROOFING CHECKOFF SHEET Return to 13 1air City Mall prior to Final inspection 218 S 16 Street, Blair, NE 88008 Because of limitations caused by the infeasibility to perform datalled inspections which would not Interfere with reroofing work, please indicate compliance with the following requirements fQilowinA. this reroofing job. Property Address: Contractor or Homeowner (if self) : � Permit o: MS-20. 1ri Installation Data: E NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (11907.1} ICE P WTECTION INSTALLED, An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was Installed and extends at least from the eava's ed a to a point at least 2 inches inside the exterior wall line of the building. (0905.2.7,1) STRUCTURAL COMPONENTS AIDE S tOUND: The structural roof components are capable of sup porting the roof covering system and the material and equipment loads that will be encountered during Installation of the roof covering system. (11907 FISTING COVERING WAS REMOVER: Existing roof covering was removed for one of the rcgsons required by section 8907.3 I DID MDT USE RUSTED METAL - +�E FLASHING: Existing vent flashing, metal edges, j drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (11907,6) FLASHING INSTALLED PROPERM flashing shall be reconstructed in accordance wit jItal manufacturer's installation Instructions, Meta) flashing to which bit erials are to be adhered shall be primed prior to Installation. - (11907.6) k ignat u re o Prl Date re Pe ate