00438_0001 (2).tif J u 1. 16. 2015 2:12PM No, 3230 P. 2
2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to 13 1air City Mall prior to Final inspection
218 S 16 Street, Blair, NE 88008
Because of limitations caused by the infeasibility to perform datalled inspections which would
not Interfere with reroofing work, please indicate compliance with the following requirements
fQilowinA. this reroofing job.
Property Address:
Contractor or Homeowner (if self) : �
Permit o: MS-20. 1ri
Installation Data:
E NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (11907.1}
ICE P WTECTION INSTALLED, An ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was Installed and
extends at least from the eava's ed a to a point at least 2 inches inside the exterior
wall line of the building. (0905.2.7,1)
STRUCTURAL COMPONENTS AIDE S tOUND: The structural roof components are
capable of sup
porting the roof covering system and the material and equipment loads
that will be encountered during Installation of the roof covering system. (11907
FISTING COVERING WAS REMOVER: Existing roof covering was removed for one
of the rcgsons required by section 8907.3
I
DID MDT USE RUSTED METAL - +�E FLASHING: Existing vent flashing, metal edges,
j drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (11907,6)
FLASHING INSTALLED PROPERM flashing shall be reconstructed in accordance
wit jItal manufacturer's installation Instructions, Meta) flashing to which
bit erials are to be adhered shall be primed prior to Installation. - (11907.6)
k ignat u re o Prl Date
re Pe ate