Loading...
2681_0001.tif I Jul 15 15 07:53a Allison Blaich 402 -933 -2995 p.2 2009 INTERNATIONAL RUE-j'�p"Ilu""EN"ITI AL CODE F 1 I ri k i CITY OF BLAIR i T Return to Blair City Hall prior to Final Inspection 218S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing�job. 7 Property Address: 'I' -,1�t �— � 1 Contractor or Homeowner (if self) : �(! i Permit& MS -20 —61 installation Date: ^ �! YES NO a' ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ❑ ICE PROTEGTiON INSTALLED An lee barrier that consists of at least two layers of undedayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from fte eaave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) ❑ STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) ❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R9 I (r C3 DID NOT USE RUSTED METAL OR FI..ASHING: Existing vent flashing, metal edges, i drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) M' ❑ FLASHING INSTALLED PROPERLY: Flashing shali be reconstructed in accordance with approved manufacturer's Installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to Installation. (8907.6) T� Signatu f rima ln�tail Date Signatu a of Permitolder Date