CITY OF BLAIR REROOFING H FF SHEET
Return to Blair City Hall prior to Final Inspection
218 S 16 Street, Blair, NE 68008
i
Because of limitations caused by the infeasibility to perform detailed inspections which would
Mot Interfere with reroofing work, please indicate compliance with the following requirements
following- this reroofing job.
Property Address:
Contractor or Homeowner (if self) : LOLL.
Permit #: MS -20 i VA • C�3� �1
Installation Date:
YES NO
I� ❑ The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
® ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self- adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
❑ STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges,
drain outlets, gollars or metal counter - flashing were not reinstalled if rusted. (R907.5)
LT PLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
With approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation.. (R907.6)
Sig e of r Primary Installer Dat
Date
Signatu of Permit Holder