Loading...
276_0001.tif 07- 14 -'15 15;25 FROM - Absolute Customs T -373 P0001/0001 F -689 2009 UNTERNATIONAL RESIDENTIAL CODE' CITY OF BLAIR REROOFING CHECKOFF SHEET Return to B lair City Nall prior to Final inspection � 218 S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform datalled Inspections Which would not interfere with reroofing work, please Indicate compliance with the following requirements ;following this reroofing job. Prcparty Address: b �' Contractor or Homeowner (if self) LL - 4 XL� Permit #: MS-20 Installation pate. YES NO ' The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building cbdo. (8907.1) [� ICI= PROTECTIQN INSTALLED: An ice barrier that consists of at least two layers of underla ment or of a self- adhering polymer modified bitumen sheet was installed and y i extends at leapt from the eave' to a point at least 2 inches inside the exterior s wine. wall line of the building. (11905.2.7.1) STRU ARI~ 8.ADNp. The structural roof components are capable of supporting the roof covbring system and the material and equipment loads that will be encountered during installation of the roof covering system. (8807.2) EKISTlNG COVERING WAS REMt3VEE: Existing roof covering was removed for one of the reasons required by seotion 8907.3 DID NOT USE RUSTED METAL OR FLAS ING: Nating vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (1907.5) FLASHING INSTALLE PROPER C=lashing shall be reconstructed In accordance with approved manufaoturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to Installation. (8907.6) Signa ure of r Installer d to 61g re o armit Holder ate