Loading...
0_0001.tif 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection th 218S16 Street, Blair, NE 68908 Because of limitations caused by the Infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Property Address: Contractor or Homeowner (if self) ASA T) Permit #: MS-20 Installation Date: �� J `� YES NO 'The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) ICE PROTECTIO& INSTALL ED: An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was _installed and extends at least from the eave's edge to a point at least 24 inc inside the exterior wall line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (11907.2) EXISTING COVERING WAS.REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 DID 14OT USE RUSTED METAL OR F_LASHING* Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which m bitu inous aterials are to be adhered shall be primed prior to installation. (R907.6) u inou5 m" - §�ure of im ry Installer Date Signature of Permit Holder Date 7zooll