2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return t0 ..lair f h Hall prior to Final Inspection
1 1 Street, Blair, NE 680
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing worts, please indicate compliance with the following requirements
following this reroofing job,
Property Address: / - h ' , ` C r- L�etls
Contractor or Homeowner (if self) : u� & t - \Ac « t
i
Permit #: MS-20 - .
Installation Date,
I
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
i
ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self- adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches insrde the exterior
wall line of the building. (R906.2.7.1)
STRUCTURAL COMPONENTS ARE SO UND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
EXISTING COVERING WAS REMOVED. Existing roof covering was removed for one
of the reasons required by section 8907,3
DID NOT USE RUSTED METAL OR FLASHING; Existing vent flashing, metal edges,
drain outlets, oollars or metal counter - flashing were not reinstalled if rusted. (R907.5)
PLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bit aterials are to be adhered shall be primed prior to installation. (R907.6)
S`r r of Primary Installer ate
Signature of Permit Holder Date