Loading...
Checkoff Sheet (2) I i 07/09/2015 07:34 4025545809 HSCONT PAGE 01/01 T I ITC OF BLAIR IN HIS SHEET Return to Blair y Dull prior to Final +3 Inspection 218 i6 street, Bla ir, NE Because of limitations caused by the Infeasibility to perform detailed Inspe re h ir wou not interfere with reroofing work, please Indicate compliance with the follo following this reroofing job. j ! / Property Address: Contractor or Homeowner (if eelf) : Permit #: MS-2014- -0-3- 2 —/ / Installation bate: I NO l The materials and methods of application use for recovering or re placing the ex isting roof covering comply with the requirements of the building code. (8997.1) j ICE PROYECTION l STALLED: An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer mollified bitumen sheet was installed and extends at least from the save's ed a to.a point at least 2-4 inches inside the exterior wall line of the building. (R905.27.1) STRUCT COMPO ARE SQUNt]: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) ( EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 DID NOT USI~ RUSTED MET.�A,L OR FLHI ASNG; Existing vent dashing, metal edges, drain outlets, colittrs or metal counter - flashing were not reinstalled if rusted, (R907,5) FWHINO INSTALLED PROPERLY flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prier to installation. (11997.6) sim atov of Prim ry Installer date Date signature of Permit Hold r I