Checkoff Sheet (2) I
i
07/09/2015 07:34 4025545809 HSCONT PAGE 01/01
T I
ITC OF BLAIR IN HIS SHEET
Return to Blair y Dull prior to Final
+3 Inspection
218
i6 street, Bla ir, NE
Because of limitations caused by the Infeasibility to perform detailed Inspe re h ir wou
not interfere with reroofing work, please Indicate compliance with the follo
following this reroofing job. j
! /
Property Address:
Contractor or Homeowner (if eelf) :
Permit #: MS-2014- -0-3- 2 —/ /
Installation bate:
I NO
l The materials and methods of application use for recovering or re placing the ex isting
roof covering comply with the requirements of the building code. (8997.1) j
ICE PROYECTION l STALLED: An ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer mollified bitumen sheet was installed and
extends at least from the save's ed a to.a point at least 2-4 inches inside the exterior
wall line of the building. (R905.27.1)
STRUCT COMPO ARE SQUNt]: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
( EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section 8907.3
DID NOT USI~ RUSTED MET.�A,L OR FLHI
ASNG; Existing vent dashing, metal edges,
drain outlets, colittrs or metal counter - flashing were not reinstalled if rusted, (R907,5)
FWHINO INSTALLED PROPERLY flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prier to installation. (11997.6)
sim atov of Prim ry Installer date
Date
signature of Permit Hold r
I