Loading...
01790_0001.tif i ATIONAL RESIDENTIAL CODE 2009 INTERN QTY OF BLAIR REROOFING Return to Blair City Hall prior to Final inspection 2'18 S '16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to'perform detailed inspections which would i not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Permit Installation Date YES NO 0 The materials and methods of application used for recovering or replacing the existing yk roof covering comply with the requirements of the building code. (R907.1) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment [Dads that will be encountered during installation of the roof covering system. (R907.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 flashing, metal edges, drain NO RUSTED METAL OR FLASHING: Existing vent g, g outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous aterials are to be adhered shall be primed prior to installation. (R907.6) Sign e of unary st r Date Sign e of Per it er D to