Loading...
02984_0001.tif i i Jul, 6. 2015 2:17PM No. 6507 P. 1 INTERNAT RESIDENTI CITY t REROOFI CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection 218 B I Street, Blair, NB 68008 13ecause of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following f irements following this reroofing job. _� Property Address: L ZI . Contractor or Homeowner (if self) IYA2 hermit #: MS -20 0 , 2 ' Z ( 4 Installation Date: 2f p ! YES The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building cone. (8907.1) ICE PROTECTION INSTALLER An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.21.1) STRUCTURAL COMPONENTS ARE OUND, The structural roof components are capable of supporting the roof covbri►1g system and the material and equipment loads that will be encountered during Installation of the roof covering system, (R907.2) i EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 0 CT DID NO USE RUST1 =1) METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5) j . I FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance With approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. • (R907.6) 1 Signature Pr' a Steller date Date Signature of Permit Holder I