2009 INTERNATIONAL RESIDENTIAL CODE'
CITY OF BLAIR REROOF
Return to Blair City Mall prior to Final inspection
2 `18 S 16 Street, Blair, NE 6800$
i
Because of limitations caused by the Infeasibility to perform detailed Inspections which would
_not interfere with reroofing work, please Indicate compliance with the following requirements
f ollowing. this reroofing job.
Property Address:
Contractor or Homeowner (if self) ; �`� ` '
hermit #: MS -20
drosfia[[afiio►t irate: --
_ i
i
YES NO
The materials and methods of application used for recovering or replacing the e)dsting
roof covering comply with the requirements of the building code. (R907A)
D �1 ICE PROTECTION INSTALLED An lee barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modifled bitumen sheet was installed and
extends at least from the cave's edge to a point at least 24 inches insida the exterior
wall line of the building. (8905,2.7. t)
STRUCTURAL, COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (8907.2)
i
EXISTING COVERING WAS REMOMEa: Existing roof covering was removed for one
of the reasons required by section 8907,3
L` li ❑ DID NOT USE PUSTi;D METAL OR FLASHING: Existing vent flashing, metal edges,
drain outlets, Qollars or metal counter-flashing were not reinstalled if rusted. (8907.5)
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
With approved manufacturer's installation Instructions. Metal flashing to which
Bituminous materials are to be adhered shall be primed prier to installation.- (8907.0)
Signi ure of Primary Installer date
Signature f Permit Holder Date