Loading...
03223_0001.tif i Jul, 2. 2015 12:17PM No, 6481 P. 1 2009 INTERNATIONAL RESIDENTIAL CODE' CITY OF BLAIR REROOF Return to Blair City Mall prior to Final inspection 2 `18 S 16 Street, Blair, NE 6800$ i Because of limitations caused by the Infeasibility to perform detailed Inspections which would _not interfere with reroofing work, please Indicate compliance with the following requirements f ollowing. this reroofing job. Property Address: Contractor or Homeowner (if self) ; �`� ` ' hermit #: MS -20 drosfia[[afiio►t irate: -- _ i i YES NO The materials and methods of application used for recovering or replacing the e)dsting roof covering comply with the requirements of the building code. (R907A) D �1 ICE PROTECTION INSTALLED An lee barrier that consists of at least two layers of underlayment or of a self - adhering polymer modifled bitumen sheet was installed and extends at least from the cave's edge to a point at least 24 inches insida the exterior wall line of the building. (8905,2.7. t) STRUCTURAL, COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907.2) i EXISTING COVERING WAS REMOMEa: Existing roof covering was removed for one of the reasons required by section 8907,3 L` li ❑ DID NOT USE PUSTi;D METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, Qollars or metal counter-flashing were not reinstalled if rusted. (8907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance With approved manufacturer's installation Instructions. Metal flashing to which Bituminous materials are to be adhered shall be primed prier to installation.- (8907.0) Signi ure of Primary Installer date Signature f Permit Holder Date i I i