Loading...
02893_0001.tif i 07- 01 -'15 14,14 FROM- Absolute Customs T -363 P0002/0002 F -658 200`9 INTERNATIONAL RESIDENTIAL CODE' CITY OF BLAIR REROOFING CHECKOFF SHEET Return to B lair City Nall prior to Final inspection 2 18 S le street, B lair, NE 6$008 Because of limitations caused by the infeasibility to perform detailed inspections which would noA interfere with reroofing work, please Indicate compliance with the following requirements ?6 this reroofing job, Property Address• rr f Contractor or Homeowner (if self) Permit #!:. MS -20 � a 3 Installation late: Yl= NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building Dade. (R907.1) ICE PROTECTION NvALLO; An ice barrier that consists of at least two layers Of Underiayment or of a self - adhering polymer modified bitumen sheet was was installed and extends at least from the eave's ed a to a point at [east 24 inches inside the exterior wall line of the building. (R906.2.7.'1) ST I LLCTURAL COMPONENTS A114 SOLIN L3: The structural roof components are capable of supportifi►g the roof covbring system and the material and equipment loads that will be encountered during Installation of the roof covering system. (8907.2) ' I EXISTING COVERING VITAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 • i J31D NOT_USE R ,9 D METAL~OR FLASHING; Existing vent flashing, 010tal edges, drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (8907.5) rLA81 lN0 INSTAi -UEO PROPERLY; Flashing shall be reconstructed in accordance with approved manufacturers installation instructions. fetal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907.6) Sign tore of Primary Installer Bate Signature of Permit Helder Lute i I i