02975_0001.tif 06/29/2015 MON 10:21 FAX 0001 /001
I
i
INTERNAT �/ J
CITY OF BLAIR REROOFING
i
Return to Blair City Hall prior to Final Inspection
218 S le Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
Rot interfere with reroofing work, please indicate compliance with the following requirements
following. this reroofing job. ��!!
Property Address'
Contractor or Homeowner (if self)
Permit 9-: MS -20 —k4-;L1.
Installation Date:
i
YES fNO
(� ® The materials and methods of application used for recovering or replacing the existing
roof covering comply with. the requirements of the building code. (R907.1)
t ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self- adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.'1)
L� ❑ STRUCTURAL. COMPONENTS ARE SOUND. The structural roof components are
C apable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
I� ® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5)
I FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed priorto installation. (R907.6)
S a ure of rimary staller Date
Signa re of Permit Z Holde Date
i
I