Loading...
02975_0001.tif 06/29/2015 MON 10:21 FAX 0001 /001 I i INTERNAT �/ J CITY OF BLAIR REROOFING i Return to Blair City Hall prior to Final Inspection 218 S le Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would Rot interfere with reroofing work, please indicate compliance with the following requirements following. this reroofing job. ��!! Property Address' Contractor or Homeowner (if self) Permit 9-: MS -20 —k4-;L1. Installation Date: i YES fNO (� ® The materials and methods of application used for recovering or replacing the existing roof covering comply with. the requirements of the building code. (R907.1) t ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self- adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.'1) L� ❑ STRUCTURAL. COMPONENTS ARE SOUND. The structural roof components are C apable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) I� ® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5) I FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed priorto installation. (R907.6) S a ure of rimary staller Date Signa re of Permit Z Holde Date i I