02844_0001.tif i
i
Jun, 29. 2015 10:54AM No. 1566 P. 1
2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF BLAIR REROOFING
R eturn to B lair CIV Hall prig to Final Inspection
218 S 16 Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed Inspections which would
, not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Property Address \9
Contractor or Homeowner (if self)
i
€permit #:111IS-2O• �-
j
Installation pate
i
ES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with• the requirements of the building code. (8907.1)
ICE PROTECTION INSTALLED; An ice barrier that consists of at least two layers of
urnderlayrnant or of a self - adhering polymer modified bitumen sheet was installed_ and
extends at least from the eave's edge to a paint at least 2�l inches ins►tle the exterior
wall line of the building, (1905.2.7,1)
STRUCTURAL COMPONENTS ARE SOUND. The structural roof components are
capable of supporting the roof covoririg system and the material and equipment loads
that Will be encountered during Installation of the roof covering system. (8907.2)
F_XXIS`riNG COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section 8907.3
DID NOT USE RUSTED METAL OP. FLASHING: EAsttng vent flashing, metal edges,
draln outlets, collars or metal counter - flashing were not reinstalled If rusted. (8907.5)
FL INSTALLED eKOPERLY: Flashing shall be reconstructed in accordanes
With approved manufacturer's Mstallatlon instructlons. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installatlon.•(R907.6)
Instal er Date
Date
Sig at It Ho[ r
i
i