2977_0001.tif i
06/25/2015 THU 12:10 FAX 2001 /001
2009 INTERNATIONAL RESIDENTIAL CODE'
i
CI TY OF BLAIR FIN CHECKOF SHEET
Return to Glair City Hall prior to Final Inspection
218 S 96 Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following, this reroofing job.
Property Address: -,
Contractor or Homeowner (if self)
Permit #: MS-2M/
Installation Date:
YES/ NO;
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
urnderlayment or of a self- adhering polymer modified bitumen sheet was instailed and
extends at least from the eave's edge to a point: at least 24 inches ins! ,de the exterior
wall line of the building. (R905.2.7, I)
❑ STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
EXISTING COVERING WAS REMOVED, Existing roof covering was removed for one
of the reasons required by section 8907.3
DID NOT USE RUSTED METAL OR FLASHING Existing vent flashing, metal edges,
drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.6)
❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation, •(R907.6)
Sign V o Primary Vhstaller Date
Signatilre of Per&ft Holder Date
i
I