Loading...
00599_0001.tif 06/24/2015 WED 10:52 FAx 12 001/001 :NTIAL COME' i INTERNAT CITY OF BLAIR FIN CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection 218 S 16 Street, Blair, NE 88008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements followina this reroofing job. ` Property Address. Contractor or Homeowner (if self) Permit ##: llr'ISw20�� Installation bate: S NO ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with. the requirements of the building code. (R907.1) ❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self- adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2,7.1) i ❑ STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) ❑ EXISTING COVERING WAS RE MOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 DID NOT USE RUSTI~D N(1 =TAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter flashing were not reinstalled if rusted. (8907.5) FLASHING] D PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation.. (R907.6) Sig e of Primary Insta er Date Signature of Permit HoldO Date