00599_0001.tif 06/24/2015 WED 10:52 FAx 12 001/001
:NTIAL COME'
i
INTERNAT
CITY OF BLAIR FIN CHECKOFF SHEET
Return to Blair City Hall prior to Final Inspection
218 S 16 Street, Blair, NE 88008
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
followina this reroofing job. `
Property Address.
Contractor or Homeowner (if self)
Permit ##: llr'ISw20��
Installation bate:
S NO
❑ The materials and methods of application used for recovering or replacing the existing
roof covering comply with. the requirements of the building code. (R907.1)
❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self- adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2,7.1)
i
❑ STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
❑ EXISTING COVERING WAS RE MOVED: Existing roof covering was removed for one
of the reasons required by section 8907.3
DID NOT USE RUSTI~D N(1 =TAL OR FLASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter flashing were not reinstalled if rusted. (8907.5)
FLASHING] D PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation.. (R907.6)
Sig e of Primary Insta er Date
Signature of Permit HoldO Date