Loading...
Checkoff Sheet 03040_0001.tif i Jun, 16. 2015 9 36A No. 6313 P. 1 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF BLA REROOFI Return to Blair City tell prior to Final inspection 218S 16th Street, Blair, NE 88008 Because of limitations caused by the infeasibility to perform detailed inspections which would _not Interfere with reroofing work, please Indicate compliance with the following requirements following, this re r oofing job. Property Address: Contractor or Homeowner (if self) Permit ##: MS Installation Date: Y!� NO The materials and methods of application used for recovering or replacing the existing li roof covering comply with the requirements of the building code. (R907.1) ❑ ICE PROTECTION INSTALLED An ice barrier that consists of of least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches insrde the exterior wall line of the building (R905.2.7.1) STRUCTURAL COMPONENTS ARE dOUND The st roof components are capable of supporting the roof covering systeirl and the material and equipment scads that be encountered during installation of the roof covering system. (8907.2) 0 EXISTING CcO W A S REMOVED. Usting roof covering was removed for one of the reasons required by section R907.3 DID NOT U$g RUSTi5D METAL 0R FLASHING; Existing vent flashing, metal edges, drain outlets, gollars or metal counter - flashing were not reinstalled if rusted. (R907.6) PLASHING INSTALLED PROPERLY. Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which ituminou materials are to be adhered shall be primed priorto 1nstaliatlon.-(8907.S) i Signature of yffilary I taller pate Signature of Permit Holder Date I �I