Jun, 16. 2015 9 36A No. 6313 P. 1
2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF BLA REROOFI
Return to Blair City tell prior to Final inspection
218S 16th Street, Blair, NE 88008
Because of limitations caused by the infeasibility to perform detailed inspections which would
_not Interfere with reroofing work, please Indicate compliance with the following requirements
following, this re r oofing job.
Property Address:
Contractor or Homeowner (if self)
Permit ##: MS
Installation Date:
Y!� NO
The materials and methods of application used for recovering or replacing the existing li
roof covering comply with the requirements of the building code. (R907.1)
❑ ICE PROTECTION INSTALLED An ice barrier that consists of of least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches insrde the exterior
wall line of the building (R905.2.7.1)
STRUCTURAL COMPONENTS ARE dOUND The st roof components are
capable of supporting the roof covering systeirl and the material and equipment scads
that be encountered during installation of the roof covering system. (8907.2)
0 EXISTING CcO W A S REMOVED. Usting roof covering was removed for one
of the reasons required by section R907.3
DID NOT U$g RUSTi5D METAL 0R FLASHING; Existing vent flashing, metal edges,
drain outlets, gollars or metal counter - flashing were not reinstalled if rusted. (R907.6)
PLASHING INSTALLED PROPERLY. Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
ituminou materials are to be adhered shall be primed priorto 1nstaliatlon.-(8907.S)
i
Signature of yffilary I taller pate
Signature of Permit Holder Date
I