Loading...
00071_0001.tif 06- 15 -'15 17,40 FROM- Absolute Customs T -353 P0001/0001 F -614 2"'009 INTERNATIONAL i RES CITY OF BLA REROOFING CHECKOFF SHEET Return to 131air City Hall prior to Final inspection 218 S le Street, Blair, HE 68088 Because of limitations caused by the infeasibility to perform detailed Inspections which would not interfere with reroofing work, please indicate compliance with the following requirements followinq this reroofing Job. Property Address; 3 Contractor or Homeowner (if self) : c a f ` [IliS -28 1 U Permit #-, '" Installation bate; YES Wo I The materials and methods of appilcation used for recovering or replacing the existing roof covering oomply with the requirements of the building code. (11907.11) ICI= PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was Installed and extends at Ceast from the cave's cd e to a point at le_ � ast 24 inches inside the exterior wall line of the building. (R9O5.2.7,1) STRUCTURAL compoisigNTS Al: BOUND; The structural roof components are j capable of supportft the roof covering system and the material end equipment loads that will be encountered during installation of the roof covering system. (8907.2) EXigiNC coyrERING WAS REMOVED: Existing roof cowering was removed for one of the reasons required by section 8907.3 iD NOT USE RUST IVIIW`fAL �R Pl-ASHING; Fisting vent flashing, metal edges, drain outlets, Dollars or metal counter-flashing were not reinstalled if rusted. (8907.5) FLASHI A INS L -r=D PRO) ?PR#, : Plashing shalt be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which b uminous materials are to be adhered shall be primed prior to installation, (R907.6) s /Al atuPe of P [Mary Installer Date Sig at e f ermrt Ho1'der Date ' I L�