00071_0001.tif 06- 15 -'15 17,40 FROM- Absolute Customs T -353 P0001/0001 F -614
2"'009 INTERNATIONAL i
RES
CITY OF BLA REROOFING CHECKOFF SHEET
Return to 131air City Hall prior to Final inspection
218 S le Street, Blair, HE 68088
Because of limitations caused by the infeasibility to perform detailed Inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
followinq this reroofing Job.
Property Address; 3
Contractor or Homeowner (if self) : c a f `
[IliS -28 1 U
Permit #-, '"
Installation bate;
YES Wo
I The materials and methods of appilcation used for recovering or replacing the existing
roof covering oomply with the requirements of the building code. (11907.11)
ICI= PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was Installed and
extends at Ceast from the cave's cd e to a point at le_ � ast 24 inches inside the exterior
wall line of the building. (R9O5.2.7,1)
STRUCTURAL compoisigNTS Al: BOUND; The structural roof components are j
capable of supportft the roof covering system and the material end equipment loads
that will be encountered during installation of the roof covering system. (8907.2)
EXigiNC coyrERING WAS REMOVED: Existing roof cowering was removed for one
of the reasons required by section 8907.3
iD NOT USE RUST IVIIW`fAL �R Pl-ASHING; Fisting vent flashing, metal edges,
drain outlets, Dollars or metal counter-flashing were not reinstalled if rusted. (8907.5)
FLASHI A INS L -r=D PRO) ?PR#, : Plashing shalt be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
b uminous materials are to be adhered shall be primed prior to installation, (R907.6)
s /Al
atuPe of P [Mary Installer Date
Sig at e f ermrt Ho1'der Date
' I
L�