3254_0001.tif i
i
06/12/2015 08:43 FAX 4025332173 (A0011001
2009 INTERNATIONAL I
RESIDENT
CITY OF BLAIR REROOF K T
Return to Blair City/ tall prior to Final inspection
210 S 1 Street, Blair, NE 68008
Because of limlta #lops caused by th e Indtc compliance detailed requir ements
Io Interfere with reroofing work, pl ease
following this reroofing Job.t i
Property Address: 1 [ . -- t
Contractor or Homeowner (If self) ,
Permit 0. MS -2o p
Installation Date: " rt f 1
I
YES NO j
❑ "'The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
❑ ICE PROTECTION INSTALLED: An Ice barrier that consists of at least twu layers of
underlayment or of a self - adhering polymer modified bitumen sheet was l�nstalled and
extends at least from the eaya's edge to a point at least 24 inches Ins►de the exterior
wall line of the building. (R905.2.7.1)
STRUCTURAL COMPONENTS ARE SQUND; The structural roof components are
capable of supportlhg the roof covering system and the material and equipment loads
that will be- encountered during installation of the roof covering system. (R907
❑ i^X45 ING COVE=RING WAS REMOVED, Existing roof covering was removed for one
of the reasons required by section R907.3
. a ..
❑ DID NOT list+ RU !=D Mg AL OR F sHl G. Existing vent flashing, metal edges,
drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
I
❑ EL_ASH1Na INSTALLED PROPER ,Y. Flashing shall be reconstructed in accordance
with ap manufacturar's Installation instructlons. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.
s)
;signature of Primary Installer pets
Data
t@n ature of Permit H er
I
i