Loading...
3009_0001.tif ,i 0611212015 10:06 OW) P.0021002 2009 INTERNATIONAL RESIDENTIAL Cu CITY OF BLAIR REROOFING CHECKOFF SHEET R eturn to 131air to Mall prior to Final Inspection - 1 s '16 Street, Blair, NE 88008 Because of limitations caused by the Infeasibility to perform {detailed Inspections which would "Interfere with reroofing work, please Indicate compliance with the following requirements a� this reroofing job. Property Address: _ Ay Cont ractor or Flornao (If self) : d `-- Ve -' Permit #: MS -20 1 - Installation: pate: 10- � 4 YES NO I ' ' The materials and methods of application used for recovering or replacing the existing roof covering comply with, the requirements of the building code. (8947.7) icr; pRDTECj1QN i .I : An ice barrier that consists of at least two layers of underlayment or of a self adhering polymer modified bitumen sheet was Installed and extends at least from the cave's edge to a point at le 24 Inches i n i e the exterlor wall line of the building. (11805.2,71) STRUp7URAl. COMPONENTS ARE.S�OU D- Thestruoturei roof compon®nts are capable of suppordhg the roof covering system and the material and equipment loads that will be encountered during Installation of the roof covering system. (RS07.2) exiaJiNG COVERING WAS RE.OV1:13� Existing roof covering was removed for one of the reasons required by section 8907.3 jo 1D lqOT U§5 HU gjgQjffjAL OR E 3HING: lxisting vent flashing metal edges, drain outlets, Dollars or metal counts, flashing were not reinstalled lfrusted. (R907.5) ! FLAISHING INSTALLED P PRY: Flashing shall be reconstructed In accordance With approved man*oturees Installation Instructions. Metal flashing to which bituminous materials are to be adhered shall bs primed prior to Installation. (R907.e) re of ry I r Date e of t� [fi Holder Date I