Loading...
Checkoff Sheet (4).tif 2009 INTERNAT CITY O F BLAIR REROOFING CHECKOFF SHEET I Return to I Blair C ity H all prior to Final inspection 2 18 S W street, Blair, NE 68 Because of limitations caused by the Infeasibility to perform detailed inspections which would not interfere with reroofing work, Tease indicate compliance with the following requirements fqUg3gM this reroofing job. Property Address. Contractor or Homeowner (if self)i : ` c Permit #t MSw2� 1 Installation Date: ` . Cg1 i YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) ICE PROTECTION INSTALLED; An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eaves to a point at least: 24 inches inside the exterior wall line of the building, (R905.2.7.1) STRUCTi URAL COME )NENTS ARE SOUND: The structural roof components are capable o f supportlhg the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907.2) EXISTING C ®VERING WAS REMOVEI : Existing roof covering was removed for one - of the reasons required by section 8907.3 DID Nt1T llSE RUST® METAL O R PLASHINGz Existing vent flashing, m etal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5} FLASHING INSTALLED PR_O Flashing shall be reconstructed In accordance With approved manufacturer's Installation. instructions. Metal flashing to w hich bituminous materials are to be adhered shall be primed prior to instaliatlon.•(R907.6� Signat re of Primary In Data a Date Sig ature of Permit Holder