Checkoff Sheet (4).tif 2009 INTERNAT
CITY O F BLAIR REROOFING CHECKOFF SHEET
I
Return to I Blair C ity H all prior to Final inspection
2 18 S W street, Blair, NE 68
Because of limitations caused by the Infeasibility to perform detailed inspections which would
not interfere with reroofing work, Tease indicate compliance with the following requirements
fqUg3gM this reroofing job.
Property Address.
Contractor or Homeowner (if self)i : `
c
Permit #t MSw2� 1
Installation Date: ` . Cg1
i
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (8907.1)
ICE PROTECTION INSTALLED; An ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eaves to a point at least: 24 inches inside the exterior
wall line of the building, (R905.2.7.1)
STRUCTi URAL COME )NENTS ARE SOUND: The structural roof components are
capable o f supportlhg the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (8907.2)
EXISTING C ®VERING WAS REMOVEI : Existing roof covering was removed for one
- of the reasons required by section 8907.3
DID Nt1T llSE RUST® METAL O R PLASHINGz Existing vent flashing, m etal edges,
drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5}
FLASHING INSTALLED PR_O Flashing shall be reconstructed In accordance
With approved manufacturer's Installation. instructions. Metal flashing to w hich
bituminous materials are to be adhered shall be primed prior to instaliatlon.•(R907.6�
Signat re of Primary In
Data
a
Date
Sig ature of Permit Holder