2266_0001.tif 0611212015 10:05 (FAX) P.0011002
2009 INTERNATIONAkIll. RESIDENTIAL C
CITY OF i
BLAIR REROOFING
Return to B lair City Fall prior to Final Inspection
218 8 le Street Blair, NE 68008
Because of limitations caused icy the Infeasibility to perform detalled lnspectlone whleh would
no Interfere with reroofing work, please indicate compliance with the following requirements
fg 1lowing this reroofing job.
Property Address'.
- ro Contractor or Homeowner (if self) : " F ' "
Permit MS-20 � !
Installation Cate:
Y NO
• ' The materials and methods of application used for recovering or replacing the w dsting
roof covering comply with the requirements of the building code. (11907.1 )
ICE PROT CTIQN lN8TA -LE ,An Ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was Installed and
extends at lust from the eav&s edge to a point at least 24 Inches insl'da the exterior
wall line of the building. (R9052.7.1)
,! COMP ENTS �► SaUN The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be enoountered during installation of the roof covering system. (8907.2)
OVER1 la,,, WAS RE ED *- 5xlsting roof covering was removed for one
of the reasons required by section RW.3
DILL N T USE USTI =i] MML OR IN • >+xlsting vent flashing, metal edges,
drain outlets, collars or metal counter-flashing were not reinstalled If rusted. (RG07.5)
Aid SHING INSTALLEUR ' Flashing shall bs reconstructed In accordance
with approvsd manufaoturer's installation Instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to Installation.. (R9g7,6)
re o Mary I gate
I Date
of Par older
I