Loading...
3007_0001.tif i i 06110/2015 10:17 4025545509 HSCONT PAGE 01101 2009 Jrq "'TERNATIONAL RESIDENTIAL CODE I' AI . REROOFING Return to Slair airy Mall prior fio F i n al inspection 210 16- Blair, EVE 65008 Because of limitations caused by the infeasibility to perform detailed Inspections which would interfere with reroofing work, please indicate compliance with the following requirements tollovvina this reroofing job. Property Address: ! ! S Ca - ~ Contractor or Homeowner (if self? Permit #: Nils- 2 - a ^ �— f Installation Date: f 7— 2 t ,/ � YES NO � Q The material and methods of appliccition weed for recovering Or roof covering comply with the requirements of the building code r mg the existing ( R90 7.1) ICE PROTECTION 1 STALLED: An ice barrier that cans °s underlayment or of a self -adhering � is °f at [east two layers of extends at least from the eave's d point t lea point 2 e inches e ins de or d wall lino of the building, (h905,2,7.1} STRUCTURAL, CQMPONE NTS ARE SOUND: The structural roof components are t capable of supporting the roof covering system and the material and equlpment loads that ill be encountered during installation of the roof covering system. (R9O7,2) Q EXISTING COV ERING WAS PE"r VE10' . Existing roof covering was removed for one of the reasons required by section R907,3 Di® NOT USE RUSTED METAL . 011 FLA$HINO: Existing vent flashing, metal edges, drain outlets, coilers or metal cpunter flashing were not reinstalled if rusted, (R907,5) Q FLASHING INSTALLED PROPERLY: Flashing shall be recons n #rue #ed [n accordance � with approved manufacturer's installation ins #ructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907.6) i at of Prirri ry installer Date Signature of Permit Hold r r • Da