Loading...
2942_0001.tif 2009 INTERNATIONAL I NTI ' CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection 218S I 6 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. i Property Address: 7 f� e Contractor or Homeowner (if self) Permit #: MS -20- �2q Installation Date: ` c ` YES NO ❑ The materials and methods of application used for recovering or replacing the existing roof coverin g co I with. the requirements of the building code. (R907.1) N ❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) i ( ❑ STRUCTURAL COMPONENTS ARE SOUND: The. structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) ❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing.. metal edges, j drain outlets, gollars or metal counter - flashing were not reinstalled if rusted. (R907.5) ❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminou aterials are to be adhered shall be primed prior to installation. (R907.6) . I Sig ature, - Pr' ary installer Date Date Signatur f ermit der I