CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair City Hall prior to Final Inspection
218S I 6 Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
i
Property Address: 7 f�
e
Contractor or Homeowner (if self)
Permit #: MS -20- �2q
Installation Date: ` c `
YES NO
❑ The materials and methods of application used for recovering or replacing the existing
roof coverin g co I with. the requirements of the building code. (R907.1)
N
❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
i
( ❑ STRUCTURAL COMPONENTS ARE SOUND: The. structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing.. metal edges, j
drain outlets, gollars or metal counter - flashing were not reinstalled if rusted. (R907.5)
❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminou aterials are to be adhered shall be primed prior to installation. (R907.6)
. I
Sig ature, - Pr' ary installer Date
Date
Signatur f ermit der