Loading...
2710_0001.tif i i 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF BLA REROOFING CHECKOFF SHEET i Return to Blair City Hall prior to Final Inspection 218 S 1,e Street, Blair, NE 65008 Because of limitations caused by the Infeasibility to perform detailed inspections which would ng Interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Property Address: 1 007 CLyzv� D, i Contractor or Homeowner (if self) Permit , MS-20 - Installation Date: YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1 ICEE PROTECTION INSTAL.LgP_. An ice barrier that consists of at least two layers of underlayment or of a self- adhering polymer modified bitumen sheet was installed and extends at Iyast.frorrt the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905-2.7. 1) STR�RAL COMPONENTS ARE §QUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installations of the roof covering system. (R907.2) EX16TINIG COVERING WAS } gMOVED: Existing roof covering was removed for one of the reasons required by section 8901.3 ID 0T W SE RUST IVI ET&9B F HIND: Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted, (8907.6) I FLASHING INSTA R QFI =RLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907.6) Signature of Primary Installer pate /V —/,o -/ Signature of Permit Holder � Bate — -- i I i TO 39vd JNIdOOd HOVdSIV Z T0:8T STOZf0T /90