2710_0001.tif i
i
2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF BLA REROOFING CHECKOFF SHEET
i
Return to Blair City Hall prior to Final Inspection
218 S 1,e Street, Blair, NE 65008
Because of limitations caused by the Infeasibility to perform detailed inspections which would
ng
Interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Property Address: 1 007 CLyzv� D,
i
Contractor or Homeowner (if self)
Permit , MS-20 -
Installation Date:
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (8907.1
ICEE PROTECTION INSTAL.LgP_. An ice barrier that consists of at least two layers of
underlayment or of a self- adhering polymer modified bitumen sheet was installed and
extends at Iyast.frorrt the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905-2.7. 1)
STR�RAL COMPONENTS ARE §QUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installations of the roof covering system. (R907.2)
EX16TINIG COVERING WAS } gMOVED: Existing roof covering was removed for one
of the reasons required by section 8901.3
ID 0T W SE RUST IVI ET&9B F HIND: Existing vent flashing, metal edges,
drain outlets, collars or metal counter-flashing were not reinstalled if rusted, (8907.6)
I
FLASHING INSTA R QFI =RLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (8907.6)
Signature of Primary Installer pate
/V —/,o -/
Signature of Permit Holder � Bate — --
i
I
i
TO 39vd JNIdOOd HOVdSIV Z T0:8T STOZf0T /90