2359_0001.tif J u n, 10. 2015 10.47AM No. 6277 P. 3
2009 INTERNATIONAL RESIDENTIAL CODE'
CITY OF BLAIR . i
i
REROOF
Return to Blair City Hall prior to Final inspection �
218 S 16 treet, flair, NE 0$008 C �
Because of limitations caused by the infeasibility to perform detailed Inspections which woul
_not Interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job. { L
Property Address:
.� 1
Contractor or Homeowner (if self)
Permit##: MS -20
Installation late,
YES NO
The materials and methods of application used for recovering o replacing the existing j
roof covering comply with the requirements of the building code. (R907.1)
ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 lnches inside the exterior
wall line of the building. (R905.2.7.1)
STR COMPONENTS ARE SOUND: The structural roof components are j
capable of sulipertiing the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (8907.2)
EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section 8907,3
DID NOT USE R•USTEa METAL OR FLASHING Existing vent flashing, metal edges,
�drdfn outlets,- go{iars or -metal counter - flashing were not reinstalled If rusted. (8907.5)
FLASHING INSTALLED PROPERLY: Flashing shall he reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
b" ominous aterials are to be adhered shall be primed prior to installation. (R907,5)
Signature of Primary installer Rate
Slgnatu e o P fit cr er Date
. Y
i
I
I
I