2313_0001.tif I �
Jun, 10. 2015 10:46AM No- 6277 P. 2
2009 INTERNATIONAL RESIDENTIAL CODE'
CITY OF BLA REROOFING CHECKOFF SHEET
Return to Blair City Hall prior to Final inspection
218 S 1 Street, Emir, NE 88008
0ecause of limitations caused by tho infeasibility to perform detailed inspections which would
not interfere with reroofing worn', please indicate compliance with the following requirements
fortowinn this rero4fi job.
Property Address:
Contractor or Homeowner (if self)
Permit 9: MS- 20 ...) `� - 0�
Irrstailation Date:
YES No
The materials and methods of application used for recovering or replacing the eAsting
roof covering comply witli the requirements of the building code. (8907.1)
ICE PROTECTION INSTALLED An ice barrier that-consists of at least two layers of
underlayment or of a self- adhering polymer modified bitumen sheet was installed and
extends at least from the eave's ed to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section 8907.3
i I DID NOT USE RUSTED METAL OR FLASHING: EAsting vent flashing, metal edges,
drain outlets, collars or metal counter - flashing were not reinstalled if rusted, (8907.5)
FLA INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
ituminous materials are to be adhered shall be primed prior to installation.. (R907.8)
Signatur A staller Date_
Signature of Permit Holder Date