Loading...
01839_0001.tif I Jun, 10. 2015 10.46AM No. 6277 P. 1 2009 INTERNATIONAL RESIDENTIAL CODE' CITY OF BLAIR REROOFING CHECKOFF SHEET i Return to B lair City Hall prior to Final Inspection 21 S 16 Street, Blair, NE 68008 13ecause of limitations caused by the infeasibility to perform detailed inspections which would not interfere with rer0ofing work, please indicate compliance with the following requirements floallowing this reroofing job, � n Property Address: Contractor or Homeowner (if selt) : V d Permit #: MS -20 Installation Date: 1 1 YIDS NO l� The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) ( ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's doe to a. point at least 24 inches inside the exterior wall line of the building. (11905.2.7.1) STRUCTURAL COMPONENTS ARE S UND The structural roof components are capable of sup'porting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) C3 EXISTING COVERING WAS REMOVED- Existing roof covering was removed for one of the reasons required by section 8907.3 [� DID NOT USE RUSTEIa IVIET,AL.OP. FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5) FLASHING INSTALLED PROPERLY Flashing shall be reconstructed in accordance with approved manufacturer's installation Instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation..(11907.6) [l 1 Signature of Ins lien as Signature o older date