checkoff 02762_0001.tif i
Jun 091502:18p DoneRightHomeImprovements 4029337854 p.1
2009 INTERN 1 UNA
L RESIDENTIAL CODE
CITY OF BLA REROOFI
Return to Blair City Hall prior to Final inspection
218 S 1 Street, Blair, ME 68008
Because of limitations caused by the infeasibility to perForm detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following. this reroofing job.
a eri • Address:
Pr p � _
Contractor or Homeowner (if
Permit MS -24 ._
_ Installation Date:
YIS NO
❑ The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (8907.1)
❑ ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self adhering polymer modified bitumen sheet was i� nstalled and
extends at least from the eave'sedge to a point at least 24 inches inside the exterior
wall litre of the building. (8905.2.7.1)
❑ STRUCTURAL COMPONENTS ARE SQUND: The structural roof components are
capable of supporting the roof covering system and the material and equipmentloads j
that will be encountered during installation of the roof covering system. (8907.2)
❑ E3ClST[NG C(]VERING WAS REMOVED: Ex[sting roof covering was removed for one
of the reasons required by section R907.3
. -.DID NUT USE RUSTED METAL OR FLASHING Existing vent flashing, metal edges,
drain outlets, collars or metal counter - flashing were not relnstailed if rusted. (R907.5)
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
With approved mania adorer's installatlon instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R9D7,ti)
2ni L
Si atura'a ller Da te
Signature of Permit Holder D ptue