Loading...
checkoff 02762_0001.tif i Jun 091502:18p DoneRightHomeImprovements 4029337854 p.1 2009 INTERN 1 UNA L RESIDENTIAL CODE CITY OF BLA REROOFI Return to Blair City Hall prior to Final inspection 218 S 1 Street, Blair, ME 68008 Because of limitations caused by the infeasibility to perForm detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following. this reroofing job. a eri • Address: Pr p � _ Contractor or Homeowner (if Permit MS -24 ._ _ Installation Date: YIS NO ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) ❑ ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self adhering polymer modified bitumen sheet was i� nstalled and extends at least from the eave'sedge to a point at least 24 inches inside the exterior wall litre of the building. (8905.2.7.1) ❑ STRUCTURAL COMPONENTS ARE SQUND: The structural roof components are capable of supporting the roof covering system and the material and equipmentloads j that will be encountered during installation of the roof covering system. (8907.2) ❑ E3ClST[NG C(]VERING WAS REMOVED: Ex[sting roof covering was removed for one of the reasons required by section R907.3 . -.DID NUT USE RUSTED METAL OR FLASHING Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not relnstailed if rusted. (R907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance With approved mania adorer's installatlon instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R9D7,ti) 2ni L Si atura'a ller Da te Signature of Permit Holder D ptue