CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to lair City Nall prior to Final Inspection
az
210 I 6�' reel, Blair, NE 60006
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
followinct this reroofing jab.
. �v
Property Address: , .J t i ) �,1 R
/<
Gont�� ractor or Homeowner (if self) : 1 r
hermim iVIS -20 j ` -
Installation Date: ,—
YE NO
The materials and methods of application used for recovering or replacing t he existing
roof covering comply with, the requirements of the building code. (R907.1)
ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eaye's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905,2.7.1)
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporilhg the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R007.3
DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907,5)
PLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials a abe adhered shall be primed prior to lnstallation.•(R907.6)
signature of Primary Install r Date
1 _
Sign ure of Per' it Holder Date