Loading...
2651_0001.tif i 2009 INTERNAI 10 i HECKOFF SHEET Return to Blalrr><ty ball prig to Final inspection 218 S 16 street, Blair, NE 68008 Baeause of limitations caused by the infeasibility to perform detailed inspections which woul not Interfere with r eroofing work, please indicate compilance with the following requiremall foll21MLqg ichis reroofing job. Property Address: ' Contractor or Homeowner (If self) L Permi MS- I LI Y NO [ristatl;a.Tir:sY't`ii3a'la;� .. `- • The materials and methods of apiication used for recovering or replacing the exlstln roof covering comply with the requirements of the building rude. (ROOM) �] ICE PROTECTION iNSTALLF -Di An ice Barrier that consists of at least two layers of underlayment or of a self - adhering polymer modifled bitumen sheet was installed and extends at least from the eaye's �dge to a point at least 24 lnches insrde the exterior wall line of the building. (RGD5.2• STR GTURAL.CO PON>RN S AR 808(]UND The structural roof components are capable of supporting the roof ru�ri system and the material and equipment load that will be encountered during 16stallation of the roof covering system. (R907,2) STi C COVF-PJNG WAS R�lltlOVIED: Uisting roof covering Was. removed for on of the reasons required by secti ? h 0907.3 ...,...DID._NOT- . SE.110. r= D:MB���LZR LAS NC: Usting vend flashing, edgy , drain outlets, goilars or metal counter- fflashing were not reinsfailed if rusted. (Rgt]7.5 LAS t G INSTALLED PROPEIRLY: Flashing shall be reconstructed in aonordan With approved manufacfiarer's'Installation instructions: Metal flashing to which iaituminous materials are to be adhered shall be primed prior to Installation.-(R907.6) 2P1r1ry nstal le pate e _ o erm er pate Sicd II