2651_0001.tif i
2009 INTERNAI 10 i HECKOFF SHEET
Return to Blalrr><ty ball prig to Final inspection
218 S 16 street, Blair, NE 68008
Baeause of limitations caused by the infeasibility to perform detailed inspections which woul
not Interfere with r eroofing work, please indicate compilance with the following requiremall
foll21MLqg ichis reroofing job.
Property Address: '
Contractor or Homeowner (If self) L
Permi MS- I LI
Y NO
[ristatl;a.Tir:sY't`ii3a'la;� .. `-
•
The materials and methods of apiication used for recovering or replacing the exlstln
roof covering comply with the requirements of the building rude. (ROOM)
�] ICE PROTECTION iNSTALLF -Di An ice Barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modifled bitumen sheet was installed and
extends at least from the eaye's �dge to a point at least 24 lnches insrde the exterior
wall line of the building. (RGD5.2•
STR GTURAL.CO PON>RN S AR 808(]UND The structural roof components are
capable of supporting the roof ru�ri system and the material and equipment load
that will be encountered during 16stallation of the roof covering system. (R907,2)
STi C COVF-PJNG WAS R�lltlOVIED: Uisting roof covering Was. removed for on
of the reasons required by secti ? h 0907.3
...,...DID._NOT- . SE.110. r= D:MB���LZR LAS NC: Usting vend flashing, edgy ,
drain outlets, goilars or metal counter- fflashing were not reinsfailed if rusted. (Rgt]7.5
LAS t G INSTALLED PROPEIRLY: Flashing shall be reconstructed in aonordan
With approved manufacfiarer's'Installation instructions: Metal flashing to which
iaituminous materials are to be adhered shall be primed prior to Installation.-(R907.6)
2P1r1ry nstal le pate
e _
o erm er pate
Sicd
II