Loading...
cl_0001.tif i i CITY Of F)tAIQ raise of CaO D & M Construction June 9, 2015 3538 S 48th Ave OMAHA NE 68106 Permit Number: MS- 2014 -00970 Roof, siding, gutters, windows i Permit Address: 972 N 24th Ave Dear Contractor, The Inspection for the above referenced permit has failed for the reason(s) shown on the enclosed inspection report. Please correct these deficiencies within 30 days and contact the Building Department at 402.426.4191 to schedule a follow -up inspection. If you have questions about the validity of these deficiencies, we will schedule an onsite appointment with an inspector. Failure to appear at a scheduled inspection will result in a $50.00 reinspection fee. If you do not contact our office within 30 days to schedule a follow -up inspection, we will turn this issue over to the City of Blair Licensing Board and City Attorney to consider suspending your contractor registration. Thankyou in advance foryour cooperation in this matter. Sincerely, Phil Green Assistant City Administrator Cc: Myra M And Robert C Sr Larsen Co- Trustees 972 N 24th Ave BLAIR NE 68008 -0000 218 South 16th Street • Blair, Nebraska 68008 + 402 -426 -4191 • Fax 402 -426 -4195 E -mail cityofblair @dblair,ne,us